DE 0800 - 11 00 77 5 info@zgs.ag

References in the construction section

Client: STRABAG

In use: TT Panel


TT Panel on the A44 motorway on behalf of STRABAG for driving onto the construction site and securing the construction machinery.

Client: ROTEN

 

In use: VarioMAT 2


Construction sites Access routes created on behalf of ROTEN on a construction project near Berlin.
400 sqm with our VarioMAT 2.

Thyssenkrupp

Client: Thyssenkrupp

In use: Vario F


Construction project in Central Germany. We laid an access road made of heavy-duty slabs to provide optimum traction for the project and the construction site vehicles.

TWF

Client: TWF

In use: MRS Heavy


Our heavy duty panel MRS Heavy was used in India for an international customer on a large construction site.

Rotec Berlin

Client: Hering Sanikonzept GmbH

In use: varioMAT 2 und eMat


On an area of 1,100 m², the sensitive surfaces (marble and solid stone) were protected from the transport of a heavy-duty crane and a transport vehicle. The construction area is located in the centre of a housing area in Stuttgart.

Kleh Systems

Client: Kleh Systems

In use: Vario F heavy duty plate 3.000 qm


For the construction of a solar park near Halle Bernberg, the access road was optimally secured by the panels, so that the construction vehicles for the installation of the solar panels have an access path and sufficient traction.

 Rhein Kreis Neuss

Client: Schools Authority City of Neuss

In use: Vario 1+


We placed the new Vario 1+ panel on a tartan track so that the sports floor is not impaired or damaged. This allowed us to ensure that the crane truck with the container delivery can drive over the panels and the pressure load is distributed accordingly.

 Garten und -Landschaftsbau Bremen

Client: Galabau Bremen

In use: varioMat 1+


The new varioMat 1+ panel is profiled on one side and is the solution for gardening and landscaping. The panel can thus be optimally used as an access road and almost completely prevents damage to the field.

Kleh Systems

Client: Kleh Systems

In use: MRS Heavy t Mat und Vario F


For a gas pipeline project on the Elbe, approx. 2 km of construction road were laid as an access road through difficult terrain in the middle of the forest to protect nature and the environment.

Cookies make it easier for us to provide you with our services. With the usage of our services you permit us to use cookies.